Structural Strengthening
- NH 14 Project (Palanpur Swaroopganj)
- NH 8 Project (Vadodara – Bharuch)
|
- GSRDC (Halol Godhra Shamlaji) Road Project
- Zeinth School - Vadodara
|
Bridge Lifting and replacement of Bearing
So in some case bearings are placed after casting of superstructure (due various reasons e.g. non availability of bearings at time construction, change in design, delay in the project, etc.). So Installation of bearings has to carry out by lifting the superstructure. We have carried out installation of bearings of 95 spans for L&T (Rajkot – Jamnagar – Vadinar Road Project) on fast track basis (i.e. in 4 months)
Structural Evolution by NDT Testing
Projects Completed
New Bridges: - Quality Assurance
- NDT Testing for quality assurance of concrete work of all newly constructed bridges of Palanpur – Swaroopganj Section, NH – 14 for L&T
- NDT Testing for quality assurance of concrete work of all newly constructed bridges of Halol – Godhra – Shamlaji Road Project, for L&T
- NDT Testing for quality assurance of concrete work of all newly constructed bridges of Rajkot – Jamnagar – Vadinar , for L&T
Existing Bridges: - Strength and Condition Assessment
- NDT Testing for Strength and Condition Assessment of 11 existing bridges of Gandhidham – Samakhali Road Project for L&T
- NDT Testing for Strength and Condition Assessment of 20 existing bridges of Rajkot – Jamnagar – Vadinar Road Project for L&T
- NDT Testing for Strength and Condition Assessment of 70 existing bridges of Halol – Godhra – Samlaji Road Proect for L&T
- NDT Testing for Strength and Condition Assessment of 20 existing bridges of Ahmedaba – Viramgam – Maliya Road Project for L&T
- NDT Testing for Strength and Condition Assessment of 3 existing bridges of Krishanagiri – Thapor Toll Road for L&T
- NDT Testing for strength and Condition Assessment of a existing bridge of Vadodara – Bharuch Expressway for L&T
- Visual Inspection for routine Maintenance of Elevated Highway at Panipat for L&T
- NDT Testing for Strength and Condition Assessment of 6 existing bridges of Palanpur – Swaroopganj Section, NH – 14 for L&T
- NDT Testing for Strength and Condition Assessment of 4 existing bridges of Gujarat State Highway for Public Works Department (PWD)
Bridge Load Test and Rating of Bridge
Projects Completed
- Bridge Load testing for quality assurance of 3 newly constructed bridges of Rajkot – Jamnagar Road Project for L&T
- Bridge Load testing for quality assurance of 7 newly constructed bridges of Halol – Godhra- Shamlaji Road Project for L&T
- Bridge Load testing for quality assurance of newly constructed flyover in Pimpri for JMC Projects
- Bridge Load testing for quality assurance of 14 newly constructed bridges of Palanpur – Swaroopganj Section, NH – 14 for L&T
- Bridge Load testing for quality assurance of 2 newly constructed bridges of Jaipur
– Agra Expressway, NH – 11 for Madhucon Projects Ltd
- Bridge Rating of Existing ROB at Chalthan on Bharuch – Surat Section, NH 8 for IRB Infrastructure developer Ltd.
- Bridge Load testing for quality assurance of newly constructed flyover on SG Highway (NH 8 C) for DRA Infracon Pvt. Ltd.
Structural Modifications and Extension
Apollo Hospital – Gandhinagar
Problems
- Helipad on roof top will increase the loading and induce lots of vibration
- To locate affected structural components
- Redesigning of those affected structural components
Solutions Worked Out
- To locate affected structural component structural designer was consulted.
- They (Structural Designer) analysis the existing structure with additional loading due Helipad
- Based on analysis it was found out that only certain columns and footing of ground floor and first floor needs to be strengthen
- It was then proposed to increase size of column from 600 mm × 600 mm to 1000 mm dia
- It was also proposed to increase thickness of footing y 200 mm
Rehabilitation & Strengthening of civil structures
- National Highway Authority of India
- Gujarat State Road Development Corporation (GSRDC) and State Government by serving Clients
- like L&T ECC
- L&T IDPL
- IRB
|
- NCC
- Sadbhav Engineering
- Dosal
- Patel Engineering
- M S Khurana
|
Consultancy
- Condition survey of 6 existing bridges of Palanpur – Swaroopganj Section, NH – 14 for L&T
- Condition survey of 32 existing bridges of Bhaurch – Surat Section, NH – 8 for IRB infrastructure
- Condition survey of Borim bridge on Zurai river in Goa for CV Kand Consultants for NHAI
- Condition survey of Major bridge at Seoni in Madha Pradesh for Sadbhav Engineering for PWD
- Condition survey of 6 bridges of Gujarat State Highway for PWD
- Condition survey of various bridges and aqueducts for PWD, Gujarat
Buildings
- Condition survey of fire damaged Warehouse for Conchem Pvt. Ltd.
Projects Completed: Testing
New Bridges: Quality Assurance
- NDT Testing for quality assurance of concrete work of all newly constructed bridges
of Palanpur – Swaroopganj Section, NH – 14 for L&T
- Bridge Load testing for quality assurance of 14 newly constructed bridges of Palanpur
– Swaroopganj Section, NH – 14 for L&T
- Bridge Load testing for quality assurance of 2 newly constructed bridges of Jaipur
– Agra Expressway, NH – 11 for Madhucon Projects Ltd
Existing Bridges: Strength and Condition Assessment
- NDT Testing for Strength and Condition Assessment of 6 existing bridges of Palanpur
– Swaroopganj Section, NH – 14 for L&T
- NDT Testing for Strength and Condition Assessment of existing Borim bridges at Goa
for C V Kand Consultants Pvt. Ltd
- NDT Testing for Strength and Condition Assessment of 4 existing bridges of Gujarat
State Highway for Public Works Department (PWD)
Repair and Rehabilitation of Bridges
Infrastructure Companies
- Planpur to Swaroopganj Section, NH14
Strengthening and rehabilitation of various bridges for L&T
- East West Corriodor, Package VI
Rehabilitation of various bridges for DIC – NCC Joint Venture
- East West Corriodor, Package V
Rehabilitation of various bridges for Jilin - Sadbhav Joint Venture
- East West Corriodor, Package III
Rehabilitation of various minor bridges for DIC – NCC Joint Venture
- Surat Manor Tollway project, Package I
Repair of bridges (Wanki, Bam, Mirchholi, Kha, Rayam, Mindhola, Kaveri, Kharera
& Ambica) for Dodsal Private Ltd
- Surat Manor Tollway project, Package II
Repair and rehabilitation of existing bridges for LG E&C – Patel (J/V)
- Repair & Rehabilitation work of existing Tapi River Bridge for
UP State Bridge Corporation Ltd
Public Works Department Gujarat State
- Flyover to Petrochemical from NH 8 near village Ranoli (Vadodara R&B Department)
- Purna River Bridge (Navsari R&B Department)
- Auranga River Bridge (Navsari R&B Department)
- Tan River Bridge (Navsari R&B Department)
- Zerva River Bridge (Vadodara R&B Department)
- Aani River Bridge (Vadodara R&B Department)
- Orsang River Bridge (Vadodara R&B Department)
- Various aquaducts on Ukai & Damang ganga L.B.M.C
- Special Repairs to Earthquake affected buildings (Bhuj, Ahmedabad & Bhachau)
for Garrison
- Engineers, Indian Army
|